Having worked in production lines I like to be efficient. In an effort to help others with their cell experimentation I am putting up this site, which may hopefully save someone some time. If you have a list of suppliers or any helpful hints please e-mail them to me and I’ll add them to site. The more information we share the better for everyone and the planet. There will be no pop-up ads on this site. I own the site and keep it running through the games running on the server and through selling local dial-up access.
Information needed for conversion database:
Name or nickname: ______________________________________________
E-mail: ________________________________________________________
Make e-mail public ____yes ____no
Vehicle Configuration:
Country____________________________________________
Conversion was ____ successful ____not successful
____Partially successful
Vehicle production year_______________________________
Make______________________________________________
Model_____________________________________________
Engine size (displacement)_____________________________
Vehicle configuration: ____Car ____Truck ___Van ___ Boat
___Other___________________
(Someone please tell me what a “Leyland” is J)
Engine materials:
_____Aluminum Heads & Block _____Aluminum Heads/Cast Iron block
_____Cast Iron Heads & Block
Original Fuel Type _____________________
Engine Configuration:
___V8 ___V6 ___Straight (in-line)-6 ___Straight-4 ___Opposed-4
Other_______________________________________________________
Engine cooling ____Air cooled ____Water cooling
Carburetion _____________________________
Ignition ________________________________
Connection to engine (where)
________________________________________________________________________________________________________________________________________________
Cell location (engine compartment, trunk, passenger compartment, etc.) ________________________________________________________________________________________________________________________________________________
Cell configuration
Height___________
Width___________
Number of Cylinders_______________
Cone Angle ________________
Parts were ___purchased from NuTech or custom made locally by (phone number too) ______________________________________________________________.
Water was acquired from ___________________________________________________
_______________________________________________________________________
Electrolytic fluid used: ________________________________________________________________________
Insulating material used (between cylinders):
________________________________________________________________________
Purchased from:
________________________________________________________________________
Charging times (instances) per day. / How long (duration) per charge / volts used
________________________________________________________________________
Days to stage 2 ______________
Days to stage 3 ______________
Other enhancements:
________________________________________________________________________